Roads & Transportation
Roundabouts
On the roundabouts page you will find pertinent information about roundabouts in our community, including how to use roundabouts, safety measures, FAQs and more.
Roundabout Simulator | Evans Road Roundabout (Two-Lane) | How Do Roundabouts Work | Roundabouts – FAQ’s
Safe Roads
Roundabouts | Safer School Travel Program | School Bus Safety | Rectangular Rapid Flashing Beacons (RRFB) | Roadway Signs | Child Car Seat Safety | Farm Vehicle Safety | Rail Safety | E-Scooters | Pedestrian Safety | Intersection Safety | Cycling Safety | Impaired Driving | Truck Routes & Commercial Vehicles | Distracted Driving | Auto Crime | Turn Signals | Longboarding | The 5'E's- Engineering, Enforcement, Education, Engagement, Evaluation | Low-Powered Vehicles
Streetlighting
Please call the Engineering Department for maintenance on street lights.
Highlighted Construction Projects
This page contains information about current transportation projects in Chilliwack.
Teskey Detention Pond - Bridlewood Park | Roadway Markings Program | Railways in Chilliwack | Vedder & South Sumas Intersection | Chilliwack River Road - Active Transportation Infrastructure | Victoria Avenue Parking Lot | Crosswalk Improvements - Rectangular Rapid Flashing Beacons (RRFB) | Yale Road Multi-Use Pathway | Edward Street Sidewalk | Tyson - Keith Wilson Design-Build Project | Culvert Projects | Emergency Sewage Outfall Repair | Utilities Upgrade Projects | Traffic Signals | Downtown Breezeway and Yale Road Crosswalk | Paving Program | Bridge Inspection Program | Active Transportation Design Project | Knight Road and Mary Street Cycling Improvements | LED Streetlight Conversion Program
Chilliwack Transportation Plan
The Transportation Plan Update - Final was approved by Mayor and Council August 21, 2018
Winter Operations
The goal of the program is to maintain safe travel routes during snow and ice conditions and restoration of the mobility for the traveling public within a reasonable time frame following cessation of storm conditions.
Sidewalks | Road Priorities | Equipment & Operations | Information for Residents
Maintenance
Regular maintenance and repair of city roadways, shoulders and signs are conducted by the City’s Public Works Department and include a wide range of activities
Completed Construction Projects
Learn about past construction projects that happened in your neighbourhood and around Chilliwack.
Spadina Avenue (Ashwell to Corbould) | Spruce Drive, Sheffield Way and Britton Avenue Bike Lane Project | Prest Road Widening and Semiault Bridge Replacement | Princess Avenue Parking Lot | Promontory Road Widening: Vedder - Chester | Valley Rail Trail North Phase 2 | Evans Road Connector | Vedder Bridge Replacement Project | Vedder Roundabout Art | Hope River Road | Williams Street & Yale Road Storm Main Replacement | Downtown Ornamental Street Lighting | Airport – Broadway Corridor Bike Lanes & Paving Project | Teskey Hillside Connector | Alder - Webb Connector | Mary Street at Hodgins Avenue (Traffic Signal Upgrade) | Camp River Road | Prest Road and Chilliwack Central Road Roundabout
Electric Vehicle Charging
Information on electric vehicle charging stations, electric vehicles and EV charging requirements for new developments.
Transit
Complete transit route maps, schedules, and rates are available on this page.
Cycle Vision Chilliwack
Cycle Vision Chilliwack
Traffic Calming
Learn more about the City's Traffic Calming policy that was updated at the May 7, 2024 Council meeting.
Traffic Counts
Automatic Traffic Count Summary for major roads in Chilliwack. 2-Way 24hr volume stats back to 1992.
Traffic Notifications
Information on lane and road closures
Active Transportation Plan
The Active Transportation Plan will help guide future investments in active transportation to support a more balanced and sustainable transportation system throughout the City of Chilliwack.