Vedder Rotary Trail Closures

Trail Closures

Map showing Vedder Rotary Trail closures in red.

Multiple sections of the Vedder Rotary Trail will be closed from August through October for flood recovery work. This website will be updated to provide more details about the anticipated timing and duration of the trail and parking lot closures. 

View the trail closure map here. 

Chilliwack has a number of trails to choose from. Find a trail in your area on our website here.


Parking Lot Closures

The following parking lots will be closed during portions of the project:

  • Lickman Road (may be closed until November 13)
  • Hooge/Hopedale Road
  • Browne Road 
  • Bergman Road
  • Giesbrecht Dike 
  • Keith Wilson Bridge and surrounding dikes

For your safety, residents and visitors to the area are asked to obey all posted signs and refrain from parking on private property. The Great Blue Heron Nature Reserve, No. 3 parking lot, Vedder Park and parking lot, Peach Park and parking lot, and some sections of the Vedder Rotary Trail will remain open for the duration of the project.


Traffic Notifications 

There will be traffic delays on Vedder Mountain Road near Qoqó:lem Park. Traffic control will perform intermittent stops to allow rock trucks to safely cross the road.

The following roads will be designated as local traffic only to allow truck access:

  • Lickman Road south of Keith Wilson Road
  • Hooge Road
  • Bergman Road
  • Browne Road
  • Lumsden Road
  • Wilson Road north of Walnut Avenue

Vedder Park, Peach Park, No. 3 Road, and the Heron Reserve Parking Lots are open. The trails from No. 3 Road to Keith Wilson, Vedder Park to the McLaren Connecting Bridge, Lickman to Webster Dog Off Leash Area, and the Rotary Trail near the Heron Reserve are open.


About the Project

This project aims to enhance flood protection along the Vedder River. Extreme weather events have deposited significantly more sediment in the Vedder River and Canal than is typical. While sediment was removed in 2022 and 2024, the additional sediment currently sitting in the Vedder River and Canal effectively increases the height of the river, resulting in increased flood risk to the City. Sediment removals will happen in August and September, during the designated in-stream works window, to help restore the river’s capacity to contain and convey floodwater. Once the project is complete, the trails will be restored to their pre-construction condition.

For information about this project, read this staff report.


Contact Us

For questions about trails, please contact our Public Works & Parks Operations Department:

For questions about sediment removal and flood protection, please contact our Engineering Department:

For construction-related questions about sediment removal and trucking, please contact Regehr Contracting Ltd.:

  • 604-856-0489
Attachments
Description Date File Size 
Vedder Rotary Trail Closures Map - July 2026 2026-07-27 2.52MB